Micro-generation

Print
Press Enter to show all options, press Tab go to next option

Your generation facility must generate electricity from a renewable energy source that is wind, water, solar irradiation, or agricultural biomass.

To ensure safe and effective connection of microgeneration systems to the Electric Utility Distribution System, a Guide for Interconnection has been prepared. The guide book outlines the installation and operation of a microgeneration system in the Medicine Hat electric service area.

Homeowner’s considering the installation of a microgeneration system are required to obtain an electric permit through the Planning, Building and Development Department (403.529.8374) in addition to meeting the protocol requirements.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer