April 2017
LM6000 turbine, stack and pipe rack
Programmable Logic Controller Cabinet being installed in Control Room
 LM6000 Inlet Air Fliter being set
Process Building being clad
100 foot stack being set
MHS 16-69 KV substation
LM6000 turbine, stack and pipe rack
Programmable Logic Controller Cabinet being installed in Control Room
LM6000 Inlet Air Fliter being set
Process Building being clad
100 foot stack being set
MHS 16-69 KV substation
HP Gas Piping and Filters
Glycol Circulation Pumps




HP Gas Piping and Filters
Glycol Circulation Pumps






January 2017
Piling is completed for foundations
Construction of structural steel begins
Substation Containment
Substation Retaining Wall being built
Stack Foundation underway
Stack Base is set
Piling is completed for foundations
Construction of structural steel begins
Substation containment
Process building floor is poured
Stack foundation underway
Stack base is set
Foundation for Turbine being formed
Service Transformers received
Dec Turbine Housing leaving Houston Texas
Turbine Fans on the road
First LM6000 delivery to Medicine Hat site
Installed turbine
Foundation for turbine being formed
Service transformers received
December turbine Housing leaving Houston Texas
Turbine fans on the road
First LM6000 delivery to Medicine Hat site
Installed turbine

October 2016
New Access Road
Generator testing at factorhy
Excavation of Wall for Substation
Substation Retaining Wall being built
Water Tank being placed on foundation Augering of Piling Foundations
New access to road site
DAX Turbo generator being tested at factory
Excavation for future substation retaining wall
Substation retaining wall being built
Process water tank being placed on foundation
Augering of piling foundations
Piling Foundations Complete




Piling foundations complete