Open Houses Information

Print
Press Enter to show all options, press Tab go to next option

<< Back

Information Story Boards
Project Open House Date Information (PDF)
Flood Mitigation All March 24 & 25, 2014 1. Overland Flow Protection
2. Storm Sewer Back Up Protection 
3. Temporary Flood Mitigation Preparations 
4. Sanitary Sewer Lift Station Replacements 
5. Sanitary Sewer Isolation Valve Assistance Program 
6. River Flats Sink Hole Study 
7. Personal Property Flood Protection 
8. Parks Trail Rehabilitation Projectst

Harlow Community July 9, 2014 1. Proposed Project Overview
2. Overland Flow Protection - Terminology & Definitions
3. 2013 Flooding
4. Flood Extents without Mitigation
5. Flood Extents without Mitigation - Harlow
6. Flood Extents without Mitigation - Harlow
7. Flood Extents without Mitigation - Harlow
8. Flood Extents with Mitigation Berm - Harlow
9. Flood Extents  with Mitigation Berm - Harlow
10. Flood Extents with Mitigation Berm - Harlow
11. Potential Berm Option - Red Deer Drive
12. Potential Berm Option - Finlay Court
13. Potential Berm Option - Harris Street
14. Potential Berm Option - 12th Street
15. Overland Flow Protection - Tentative Schedule

 Harlow Phase 1 Construction October 15, 2014 1. 2013 Flooding
2. Phase 1 Flood Mitigation
3. Phase 1 Construction
4. Construction Components
5. Construction Components continued
6. What to Expect During Construction
7. Typical Dyke Section
8. Dyke Alignment - Red Deer Drive
9. Dyke Alignment - 12th Avenue SW
10. Dyke Alignment - Harris Street
11. Red Deer Drive Roadway Re-configuration
12. Construction Traffic Control
13. Construction Truck Haul Routes
14. Examples of Typical Dykes with Pathways
15. Construction Schedule

Lions Park Community August 6, 2014 1. 2013 Flooding
2. Proposed Project Overview
3. Overland Flow Protection - Terminology & Definitions
4. Flood Extents without Mitigation
5. Flood Extents without Mitigation - Lions Park
6. Flood Mitigation - Lions Park - *updated October 2014
7. Flood Mitigation - Lions Park NW *currently being revised
8. Flood Mitigation - Lions Park SE
9. Lions Park Dyke Cross Section (1)
10. Lions Park Dyke Cross Section (2)
11. Lions Park Overland Flow Protection Schedule

 Lions Park Phase 1 Construction November 25, 2014 1. 2013 Flooding
2. Lions Park Phase 1 - Flood Mitigation
3. Lions Park Phase 1 - Construction Overview
4. Lions Park Phase 1 - Construction, continued
5. Construction - What to Expect
6. Construction Traffic Control & Haul Routes
7. Construction Schedule
8. Typical Dyke Section
9. How Dyke Alignment was Established
10. Why Trees Cannot be on or Near Dykes
11. Lions Parks Trees
12. Dyke Section - 2nd Street & Woodman Avenue
13. Dyke Section - 2nd Street & Minto Avenue
14. Examples of Dykes with Pathways
15. Project Outcomes

Riverside   Community May 6, 2015 

  1. 2013 Flooding

  2. Proposed Project Overview

  3. Terminology & Definitions

  4. Project Phases

4.5 Riverside - Phase 1

  5. Phase 1 - Preliminary Design Option

  6. Examples of Earthen Berms / Dykes with Pathways

  7. Phase 2 - Preliminary Design Options

  8. Phase 2 - Preliminary Design Options (1 & 2)

  9. Phase 2 - Preliminary Design Options (3 & 4)

10. Phase 2 - Preliminary Design Options (5 & 6)

11. Phase 2 - Preliminary Design Options (7)

12. Phase 2 - Option 1A

13. Phase 2 - Option 1B

14. Phase 2 - Option 2A

15. Phase 2 - Option 2B

16. Phase 2 - Option 3A

17. Phase 2 - Option 3B

18. Phase 2 - Option 4

19. Phase 2 - Option 5

20. Phase 2 - Option 6

21. Phase 2 - Option 7

 Riverside  Community  July 13, 2016 1.   2013 Flooding
2.   Project Phases
3.   Riverside Phase 1 Mitigation Strategy
4.   What will it look like?
5.   What will it look like? continued
6.   Roadway Improvements
7.   Traffic/Parking Access
8.   Construction
9.   Construction continued
10. Why can't trees be near a berm?
11.  Trees in Riverside

CONTACT US
E-mail: floodmit@medicinehat.ca
Phone: 403.529.8177 (Municipal Works)