Water Treatment Plant

Print
Press Enter to show all options, press Tab go to next option

<< Back

Water Treatment Plant Overland Flow Protection required the construction of 640 metres of overland flow protection for the Water Treatment Plant (WTP) and the Power Plant (PP). In 2013, a significant temporary berm was built to protect the WTP and PP including the pump houses which are critical to the operation of both facilities. The existing roadway located around the north portion of the facilities was raised to an elevation which will protect the facilities from being inundated with overland flow during a 1 in 100 year event and greater.


Key Project Milestones and Schedule
Stage Project Stage Estimated Completion Date
I River/Creek Modelling January 2014
II Preliminary Design Completed
III Detailed Design Completed
IV Tendering
Contract awarded to
Completed
Tritech Industries
V Construction Substantially complete

Public Information Session Open Houses
Date Location Time
March 24 & 25, 2014 Higdon Hall, Stampede Grounds 4 - 8 pm
Click here for story board information presented at the open houses.