In order to demolish or remove a building, you may need both a development permit and a demolition permit. It depends on the building and the situation. When you apply online, your answers will determine which permits are required for your situation.
Development permit not required if:
- The building or structure to be demolished has a gross floor area no greater than 500 square meters (5382 sq. ft.), and
- The site, building or structure is not a Historic Resource, and
- The site, building or structure is not listed on the Heritage Inventory.
Demolition permit not required if:
- The building to be demolished is a detached residential accessory building (e.g. garage, shed), and
- The building is 10 square meters (107.6 sq. ft.) or less in area, and
- The building has no utility services, nor primary utility meters/connections for the residence, and
- There are no hazardous materials (e.g. asbestos) in the construction of the building, and
- The demolition can be completed within one day and does not create a hazard to the public.
If the above conditions do not apply to your situation, then you must obtain the required permits before proceeding with a demolition.