Request a System Size Review
You (the micro-generation owner) will:
- Complete your System Size Review application
- Applications should be submitted by homeowners, as the City will not provide your personal information to a third party without prior authorization.
- Review historical consumption data for the proposed project location to ensure that the system size complies with the Electrical Utility bylaw #2244.
- Send an email to the homeowner stating the maximum allowable system size in kW (DC)
Consumption will be based on the following:
- Existing properties: usage at the proposed installation site
- New properties: usage from comparable sites
Estimated time: 10 to 14 business days